FACILITY SAFETY AUDIT

Safeguard walks your buildings with a trained eye and a clipboard, mapping every blind corridor, propped-open fire door, and camera dead zone into a prioritized action plan your board can act on.

312+
Buildings Audited
18
States Served
94%
Findings Resolved
N50 FTSAFEGUARD AUDIT SYSTEMSFACILITY: RIVERSIDE UNIFIEDREF: SGA-2026-0312 · CONFIDENTIAL
AUDIT STATUS
12 Critical Findings
8 High Priority
27 Recommendations
REPORT DATE: 05/30/2026
AUDIT ASSESSMENT REPORT

Five Domains. Every Line Item.

A Safeguard audit covers every domain of physical school safety. Pre-checked items below represent the most common failures we find in buildings across the country. How many apply to yours?

47
Total Line Items
DOM-01

Perimeter Access Control

Fencing, gates, parking approaches, and exterior door hardware

11
FINDINGS
All exterior doors require key card or code to entercritical
Perimeter fencing is continuous with no gap sectionshigh
?
Parking lot has defined pedestrian separation
Side and rear entrances are monitored during school hourscritical
Door prop alarms are installed and functional on all exterior doorshigh
?
Delivery and service entry is separated from student entry
?
After-hours access log is reviewed monthly
DOM-02

Interior Lockdown Capability

Classroom door hardware, interior barriers, and shelter-in-place readiness

9
FINDINGS
All classroom doors lock from the inside without a keycritical
Door barricade devices are available in every classroomhigh
?
Interior hallway doors can be closed to segment building
?
Lockdown procedure is posted and current in every room
Staff have practiced lockdown within the last 6 monthsmedium
Windows in classroom doors do not allow clear sightlines into roomhigh
Secondary egress exists for all occupied classroomscritical
DOM-03

Surveillance Coverage

Camera placement, recording retention, monitoring protocols, and dead zones

8
FINDINGS
?
All entry points are covered by functioning cameras
Camera footage is retained for a minimum of 30 daysmedium
Cafeteria has full coverage with no blind spotscritical
Stairwells are covered at each landinghigh
?
Parking lot coverage includes all vehicle rows
?
Camera monitoring is active during all occupied hours
Camera health check is conducted weeklymedium
DOM-04

Emergency Communication

PA systems, radio coverage, mass notification, and 911 coordination

7
FINDINGS
PA system reaches all occupied spaces including restroomshigh
Radio communication has no dead zones in the buildingcritical
?
Mass notification system reaches all staff and parents within 2 minutes
?
Dedicated emergency line is separate from main office phone
Local law enforcement has current building floor planshigh
?
Crisis communication plan is tested annually
Backup communication exists if primary systems failmedium
DOM-05

Visitor Management

Sign-in protocols, ID verification, access badging, and volunteer screening

12
FINDINGS
All visitors are required to show government-issued IDcritical
Visitor management system checks sex offender registrycritical
?
Visitor badges are time-stamped and expire same day
?
Volunteers undergo background checks before unsupervised access
Visitor sign-out is enforced — no tailgating to exithigh
?
Contractor access is logged separately from visitor access
Visitor flow is channeled through a single controlled vestibulehigh
FIELD DOCUMENTATION

Engineering-Grade Evidence

Every finding in your audit report is backed by annotated diagrams, photographs, and measurement data. This is not a checklist opinion — it is a documented engineering assessment.

EXHIBIT A — PERIMETER DIAGRAM3 GAPS FOUND
GAP-1GAP-2GAP-3PARKINGMAIN ENTRYN↑

Aerial site diagram annotated with perimeter gap locations, unsecured gate positions, and recommended fencing extensions. Amber markers indicate immediate action items.

EXHIBIT B — CAMERA COVERAGE MAP4 DEAD ZONES
DEADDEADCOVEREDDEAD ZONE

Floor plan overlay showing camera coverage zones (blue = covered, red = dead zone). Heat map generated from on-site camera angle measurements and field-of-view calculations.

EXHIBIT C — DOOR HARDWARE AUDIT7 NON-COMPLIANT
D-01KEY CARDD-02KEY ONLYD-03UNLOCKEDD-04KEY CARDD-05NO ALARMD-06BIOMETRICD-07PROPPEDD-08KEY CARDD-09NO ALARMCOMPLIANTACTION REQUIRED

Door-by-door hardware assessment documenting lock type, exterior visibility, key-from-inside capability, and prop alarm status. Non-compliant doors flagged with replacement specifications.

CERTIFIED METHODOLOGY

All Safeguard audits follow ASIS/ANSI PSC.1 physical security standards and align with the CISA K-12 School Security Guide. Every auditor is credentialed through the National Association of School Resource Officers.

WHAT YOU RECEIVE

The Audit Report

Dense with findings, methodical in its recommendations, and impossible to ignore once it is in your hands.

RPT-01

Executive Summary

A 2-page brief written for board presentation — key findings, risk severity, and top 5 immediate actions. No jargon. Ready to distribute.

2 pp
RPT-02

Full Findings Register

Every identified vulnerability documented with location, severity classification, photographic evidence, and remediation specification.

15–40 pp
RPT-03

Annotated Site Diagrams

Blueprint-style floor plans and aerial diagrams with every finding pinned to its exact location. Handed to contractors for direct remediation.

6–12 pp
RPT-04

Prioritized Action Plan

Findings sorted into three tiers: address within 30 days, address within 90 days, and long-term capital planning. Budget estimates included.

4–8 pp
RPT-05

Compliance Cross-Reference

Every finding mapped to applicable CISA, ASIS, and state-specific school safety standards — the documentation your legal team needs.

3–6 pp
RPT-06

Implementation Tracking Sheet

A living spreadsheet to assign findings to staff, set due dates, and document completion. Designed for your facilities director to own.

Spreadsheet

AUDIT PROCESS

01

Intake Call

45 min

District profile, building inventory, known concerns, scheduling.

02

On-Site Assessment

1–2 days per building

Walk every hallway, test every door, measure every camera angle.

03

Analysis & Documentation

5–7 business days

Findings classified, diagrams annotated, report drafted and reviewed.

04

Report Delivery

Scheduled presentation

Delivered to superintendent and board. Q&A session included.

TURNAROUND GUARANTEE

Final report delivered within 10 business days of the last site visit. If we miss the deadline, the follow-up consultation is free.

FIELD OUTCOMES

What Happens After the Report

Superintendents get funding. Facilities directors get specifications. Board members get documentation. Every district leaves with something actionable.

The audit found 34 vulnerabilities in our flagship building — 11 of which the district had no idea existed. The report gave us the documentation to request emergency capital funding. The board approved $420,000 within a month.
Portrait of Dr. Patricia Osei, Superintendent at Northbrook Unified School District, IL
Dr. Patricia Osei
SuperintendentNorthbrook Unified School District, IL
34
FINDINGS
$420K approved
OUTCOME
As facilities director, I've been through three vendor assessments in five years. This was the first one I couldn't argue with. Every finding was photographed, measured, and cross-referenced to a standard. I used the report to justify replacing 47 door handles across the district.
Portrait of Marcus Delgado, Director of Facilities at Riverside County Schools, CA
Marcus Delgado
Director of FacilitiesRiverside County Schools, CA
52
FINDINGS
47 doors replaced
OUTCOME
Parents were sending us articles every week after a headline somewhere. We had no documented proof of what we'd done or what we still needed to do. The Safeguard report gave us that proof. We presented it at the next board meeting and the room went quiet.
Portrait of Janelle Kim, School Board Chair at Cedar Ridge Independent School District, TX
Janelle Kim
School Board ChairCedar Ridge Independent School District, TX
29
FINDINGS
Board confidence restored
OUTCOME
312+
Buildings Audited
14,600+
Findings Documented
$12M+
Safety Funding Unlocked
94%
Client Renewal Rate
INITIATE ASSESSMENT

Request Your Facility Audit

We review every intake form personally and respond within one business day with a scope proposal and availability calendar.

AUDIT REQUEST FORMSGA-INTAKE-2026

Your answer helps us understand your timeline and tailor the first conversation.

No commitment required. Response within 1 business day.

PDF

Free 20-Point Safety Checklist

The same assessment framework our auditors use in the field. Self-assess your building before the formal audit.

Email only. No phone calls. Unsubscribe any time.

🛡ASIS/ANSI PSC.1 Certified Methodology
📋CISA K-12 School Security Aligned
🏫NASRO Credentialed Auditors
🔒All reports treated as confidential documents

PREFER TO CALL?

Reach our intake team at 1-800-555-1847
Mon–Fri, 8am–6pm Central